st3Legal Header
Raw Date Name Description Date
20200723 Announcement - July 23, 2020 Update to AER Pipeline Performance Report July 23, 2020
20200717 Announcement - July 17, 2020 Facility, Pipeline, and Well Reports Now Available as Self-Service July 17, 2020
20200703 Announcement - July 3, 2020 Hydrocarbon Storage Requirements July 03, 2020
20200608 Announcement - June 8, 2020 Annual oil and gas pool reserve files now available in ST98 June 08, 2020
20200504 Announcement - May 4, 2020 Training: Methane emissions reporting May 04, 2020
20200429 Announcement - Flood Response Fort McMurray Flood Response and Updates April 29, 2020
20200428 Announcement - April 28, 2020 Fort McMurray Field Centre Closed April 28, 2020
20200415 Announcement - April 15 2020 Relief for Industry During COVID-19 Pandemic Response April 15, 2020
20200324 Announcement - March 24, 2020 OneStop Release Update March 24, 2020
20200320 AER updates on COVID-19 The AER is adjusting its business in response to the COVID-19 outbreak. March 20, 2020
20200317 Announcement - March 17, 2020 OneStop Release Update March 17, 2020
20200210 Announcement - February 10, 2020 New version of Thermal In Situ (TIS) Water Publication February 10, 2020
20200109 Announcement - January 9, 2020 AER System Outage - Resolved January 09, 2020
20200107 Announcement - January 7, 2020 Bearspaw Petroleum Ltd. Hearing Adjourned January 07, 2020
20191218 Announcement - December 18, 2019 2019 Office Holiday Closure - Announcement – December 18, 2019 December 18, 2019
20191119 Announcement - November 19, 2019 Training Sessions: Area-Based Closure November 19, 2019
20191108 Announcement - November 8, 2019 AER-COSIA Memorandum of Understanding 2019 November 08, 2019
20191030 Announcement - October 30, 2019 Announcement -DDS, IAR and Proceeding Search outage October 30, 2019
20191018 Announcement - October 18, 2019 Training Sessions: New Well Applications Moving into OneStop October 18, 2019
20191010 Announcement - October 10, 2019 Training Sessions: AER’s Record of Site Condition Form October 10, 2019
20191010 Announcement - October 10, 2019 OneStop Delayed October 10, 2019
20190905 Announcement - September 5, 2019 New Well Applications Moving into OneStop September 05, 2019
20190806 Announcement - August 6, 2019 Training Sessions for OneStop Public Lands Act Applications August 06, 2019
20190619 Announcement - June 19, 2019 Scheduled outage for DDS and AER Map Viewers June 19, 2019
20190610 Announcement - June 10, 2019 Field Centre Closure Update June 10, 2019
20190603 Announcement - June 3, 2019 New Reclamation Certificate Application Tool: User Guide June 03, 2019
20190521 Announcement - May 21, 2019 OneStop Release Update May 21, 2019
20190508 Announcement - May 8, 2019 Directive 060 Bulk Upload Templates May 08, 2019
20190501 Announcement - May 1, 2019 OneStop Release Update May 01, 2019
20190424 Announcement - April 24, 2019 Pilot Project on Commingled Abandonment April 24, 2019
20190328 Announcement - March 28, 2019 New Core Research Centre submission notification system added to OneStop March 28, 2019
20190222 Announcement - February 22, 2019 AER Directive 039 Online Submission - OneStop Training Sessions February 22, 2019
20190131 Announcement - January 31, 2019 Public Land Information Session now available on YouTube and Latest OneStop Updates January 31, 2019
20190110 Announcement - January 10, 2019 IAR Query and EPS Query 30-Day Viewing Restrictions Lifted January 10, 2019
20181219 Announcement - December 19, 2018 2018 Office Holiday Closure December 19, 2018
20181205 Announcement - December 5, 2018 Application timelines report published December 05, 2018
20181128 Announcement - November 28, 2018 OneStop Release Update November 28, 2018
20181122 Announcement - November 22, 2018 Training for Area-Based Closure Program has been postponed until early 2019. November 22, 2018
20181109 Announcement - November 9, 2018 Public Lands OneStop Implementation Information Sessions November 09, 2018
20181101 Announcement - November 1, 2018 The AER has created the Play Workbook November 01, 2018
20181031 Announcement - October 31, 2018 Updates to Application Processing Times October 31, 2018
20181031 Announcement - October 31, 2018 Updated Joint Operating Procedures October 31, 2018
20181004 Announcement - October 4, 2018 OneStop Scheduled Outage October 04, 2018
20180926 Announcement - September 20, 2018 UPDATED: OneStop Scheduled Outage September 26, 2018
20180917 Announcement - September 17, 2018 OneStop MapViewer Training Sessions September 17, 2018
20180830 Announcement - August 30, 2018 Area Based Closure OneStop Training Sessions August 30, 2018
20180829 Announcement - August 29, 2018 The Core Research Centre will close at 12:00 p.m. on Friday, August 31 for building construction work. August 29, 2018
20180820 Announcement - August 20, 2018 Resolved: Alberta Environment & Parks (AEP) System Outage August 20, 2018
20180803 Announcement - August 3, 2018 OneStop Scheduled Outage August 03, 2018
20180730 Announcement - July 30, 2018 The AER’s ST98: Alberta’s Energy Reserves and Supply/Demand Outlook update has been released. July 30, 2018
20180718 Announcement - July 18, 2018 OneStop Scheduled Outage July 18, 2018
20180716 Announcement - July 16, 2018 Area-Based Closure Program - Industry Information Sessions July 16, 2018
20180712 Announcement - July 12, 2018 The AER is offerring OneStop training in July and August, 2018. July 12, 2018
20180618 Announcement - June 18, 2018 Annual oil and gas pool reserve files now available in ST98 June 18, 2018
20180615 Announcement - June 15, 2018 New OneStop quick reference guides and training videos June 15, 2018
20180611 Announcement - June 11, 2018 Talk AER Decommission June 11, 2018
20180531 Announcement - May 31, 2018 Website outages from June 1 until June 2 May 31, 2018
20180528 Announcement - May 28, 2018 Well, facility, and volumetric data files – now available in Petrinex May 28, 2018
20180329 Announcement - March 29, 2018 Integrated Application Process for Major Projects March 29, 2018
20180322 Announcement - March 22, 2018 Changes to ST100 March 22, 2018
20180313 Announcement - March 13, 2018 Integrated Decision Approach Information Sessions March 13, 2018
20180312 Announcement - March 12, 2018 The AER is hosting information sessions on map viewer navigation and customization and on notification reports and submissions. March 12, 2018
20180216 Announcement - February 16, 2018 Scheduled outage for Well Spacing Map and the AER Order System February 16, 2018
20180123 Announcement - January 23, 2018 Directive 067 – new FAQ January 23, 2018
20180123 Announcement - January 23, 2018 OneStop Scheduled Outage January 23, 2018
Date Raw Application Reference Notice Type Company Name Application Number(s) Date
20200805 Application 1929323 Notice of Application - Eight Kilometers Southeast of Hardisty Gibson Energy ULC 1929323 and 002-00453881 August 5, 2020
20200730 Application 008-00263298 Notice of Application - Mildred Lake Extension West – Dover River Channel and Outfall Syncrude Canada Limited 008-00263298, 001-00466043, and 053-00000026 July 30, 2020
20200729 Application OSE200001 Notice of Application - Northeast Region Cenovus Energy Inc. OSE200001 July 29, 2020
20200728 Application 1914551 Notice of Cancelled Hearing - Regulatory Appeals of Applications 1914551, 1920992, and 338430 Ovintiv Inc. 1914551 July 282, 2020
20200728 Application 1778538 Notice of Hearing - Prosper Rigel Project Prosper Petroleum Ltd 1778538 July 28, 2020
20200727 Application 1929253 Notice of Application - Yellowhead County

Notice of Application - Mine Abandonment for Portions of Licence C2003-6 and Reclamation Certification for Select Parcel of Lands within Mine No. 1757

1929253 July 27, 2020
20200723 Application 20.M.007 Notice of Application - Yellowhead County

Shell Canada Limited

20.M.007 July 23, 2020
20200629 Application 1902073 Notice of Hearing - Grassy Mountain Coal Project Benga Mining Limited 1902073 June 29, 2020
20200617 Application 1928568 Notice of Hearing - Regulatory Appeals Darren O’Brien and Jeffrey Young (former directors of Trident Exploration (Alberta) Corp. and Trident Exploration (WX) Corp.) 1928568 June 17, 2020
20200610 Application 20.M.006 Notice of Application - Forty Mile County No. 8 Winslow Resources Inc. 20.M.006 June 10, 2020
20200602 Application 1925863 Notice of Cancelled Hearing - 185 kilometres South East of Grande Prairie Peyto Exploration & Development 1925863 June 02, 2020
20200526 Application 104817 Notice of Adjournment of Hearing - Regulatory Appeal of Cancelled Reclamation Certificate TAQA North Ltd 104817 May 26, 2020
20200526 Application 20.M.005 Notice of Application - Yellowhead County Pieridae Alberta Production Ltd. 20.M.005 May 26, 2020
20200526 Application 20.M.004 Notice of Application - Municipal District of Greenview No. 16 Inception Exploration Ltd. 20.M.004 May 26, 2020
20200525 Application 1916224 Notice of Prehearing Meeting - Reconsideration of Decision to Re-issue Reclamation Certificate Sitka Exploration Ltd./Bonavista Energy Corporation 1916224 May 25, 2020
20200512 Application 20.M.003 Notice of Application - Clearwater County Shanghai Energy Corporation 20.M.003 May 12, 2020
20200428 Application 1809825 Notice of Application - Lower Athabasca region Pure Environmental Waste Management Ltd. 1809825 April 24, 2020
20200424 Application 1925863 Notice of Hearing - 185 kilometres South East of Grande Prairie Peyto Exploration & Development 1925863 April 24, 2020
20200408 Application 1928090 Notice of Application - Vista Coal Project Coalspur Mines (Operations) Ltd. 1928090 and 1928091 April 08, 2020
20200401 Application 1927912 Notice of Application - Mine Abandonment for Select Parcel of Lands Within Mine No. 1788 Capital Power GP Holdings Inc. 1927912 April 01, 2020
20200323 Application 1922830 Notice of Scheduling of Hearing - Ridgeback Resources Inc. and Westbrick Energy Ltd. Ridgeback Resources Inc. and Westbrick Energy Ltd. 1922830 March 23, 2020
20200323 Application 00340419-00-00 Notice of Cancelled Prehearing Meeting - Reconsideration of Decision to Reissue Reclamation Certificate Sitka Exploration Ltd. / Bonavista Energy Corporation 00340419-00-00 March 23, 2020
20200320 Application 1915871 Notice of Adjournment of Hearing - 18 Kilometres Northwest of Wembley CSV Midstream Solutions Corp. 1915871 March 20, 2020
20200320 Application 1923941 Notice of Cancelled Hearing - 35 kilometres from Grand Prairie Canadian Coastal Resources Ltd. 1923941 March 20, 2020
20200320 Application 1909395 Notice of Hearing - Kirby North In Situ Oil Sands Canadian Natural Resources Limited 1909395 March 20, 2020
20200311 Application 1923941 Notice of Hearing - 35 kilometres from Grand Prairie Canadian Coastal Resources Ltd. 1923941 March 11, 2020
20200310 Application 1927118 Notice of Hearing - Regulatory Appeal of Reclamation Certificate Vantage Point Resources Inc. 1927118 March 10, 2020
20200309 Application 1927656 Notice of Application - Athabasca Oil Sands Area Suncor Energy Inc. 1927656 March 09, 2020
20200304 Application 1914551 Notice of Hearing - Regulatory Appeal of Applications 1914551, 1920992, and 338430 Ovintiv Inc. 1914551 March 04, 2020
20200304 Application 20M002 Notice of Application - Municipal District of Greenview No. 16 Wolverine Energy and Infrastructure Inc. 20.M.002 March 04, 2020
20200304 Application 00340419-00-00 Notice of Prehearing Meeting - Reconsideration of Decision to Reissue Reclamation Certificate Sitka Exploration Ltd. / Bonavista Energy Corporation 00340419-00-00 March 04, 2020
20200228 Application 1927365 Notice of Application - Vista Coal Project Coalspur Mines (Operations) Ltd. 1927365, 008-00301345, 005-00311969, etc. February 28, 2020
20200227 Application 104817 Notice of Rescheduling Hearing - Regulatory Appeal of Cancelled Reclamation Certificate TAQA North Ltd. 104817 February 27, 2020
20200225 Application 1913609 Notice of Cancelled Hearing - Regulatory Appeal of Facility Licence AltaGas Ltd. 1913609 February 25, 2020
20200220 Application 1925290 Notice of Scheduling of Hearing - Regulatory Appeal of the Rejection of Application for Disposition of Licence of Occupation Canadian Natural Resources Limited 1925290 February 20, 2020
20200211 Application 1915871 Notice of Hearing - 18 Kilometres Northwest of Wembley CSV Midstream Solutions Corp. 1915871 February 11, 2020
20200211 Application 00340419-00-00 Notice of Cancelled Prehearing Meeting - Reconsideration of Decision to Reissue Reclamation Certificate Sitka Exploration Ltd. / Bonavista Energy Corporation 00340419-00-00 February 11, 2020
20200127 Application 1877294 Notice of Cancellation of Hearing - Common Carrier and Rateable Take Order Applications Bearspaw Petroleum Ltd. 1877294 and 1878333 January 27, 2020
20200121 Application 20M001 Notice of Application - Municipal District of Opportunity No. 17 Turnstone Energy Inc. 20.M.001 January 21, 2020
20200116 Application 1926656 Notice of Application - Jackfish SAGD Project Canadian Natural Resources Limited 1926656 and 011-00224816 January 16, 2020
20200113 Application 146738 Notice of Cancellation of Hearing - Regulatory Appeal of Reclamation Certificate Canadian Natural Resources Limited 146738 January 13, 2020
20200107 Application 104817 Notice of Scheduling of Hearing - Regulatory Appeal of Cancellation of a Reclamation Certificate TAQA North Ltd 104817 January 07, 2020
20200106 Application 1925373 Amended Notice of Application - Transfer of Ownership Shell Canada Limited 1925373, etc. January 06, 2020
20200102 Application 1925373 Notice of Application - Transfer of Ownership Shell Canada Limited 1925373, etc. January 02, 2020
20191219 Application 1913609 Notice of Rescheduling Hearing - 14 kilometres east of Sundre AltaGas Ltd. 1913609 December 19, 2019
20191219 Application 00340419-00-00 Notice of Hearing - Reconsideration of Reclamation Certificate Sitka Exploration Ltd. / Bonavista Energy Corporation 00340419-00-00 December 19, 2019
20191218 Application 1925863 Notice of Applicaton - Wild River Field Peyto Exploration & Development Corp. 1925863 December 18, 2019
20191217 Application 1925290 Notice of Hearing - Regulatory Appeal of the Rejection of Application for Disposition of License of Occupation Canadian Natural Resources Limited 1925290 December 17, 2019
20191217 Application 1926028 Notice of Applicaton - Edson Field Peyto Exploration & Development Corp. 1926028 December 17, 2019
20191213 Application 1926185 Notice of Applicaton - Bruderheim Diluent Recovery Unit Bruderheim Energy Terminal Limited 1926185, and 014-00010346 December 13, 2019
20191213 Application 146738 Notice of Hearing - Regulatory Appeal of Reclamation Certificate Canadian Natural Resources Limited 146738 December 13, 2019
20191206 Application 1925999 Notice of Applicaton - Meadow Creek East Project Suncor Energy Inc. 1925999 December 06, 2019
20191128 Application 19M013 Notice of Application - Long Run Exploration Ltd. Long Run Exploration Ltd. 19M013 November 28, 2019
20191122 Application 151150 Notice of Cancellation of Hearing - Regulatory Appeal of Reclamation Certificate Shell Canada Limited 151150 November 22, 2019
20191121 Application 1925597 Notice of Applicaton - Vista Mine Coalspur Mines (Operations) Ltd. 1925597, 007-301345, 004-00311969, etc. November 21, 2019
20191118 Application 1925574 Notice of Applicaton - Horizon Oil Sands Mine and Processing Plant and Horizon South Canadian Natural Resources Limited 1925574, etc. November 18, 2019
20191118 Application 1922830 Notice of Hearing - Near Brazeau Dam Ridgeback Resources Inc. and Westbrick Energy Ltd. 1922830, 1922831, 1922833, etc. November 18, 2019
20191114 Application 19M011 Notice of Application - Municipal District of Bonnyville Canadian Natural Resources Limited 19.M.011 November 14, 2019
20191114 Application 19M012 Notice of Application - Woodlands County Outlier Resources Ltd. 19.M.012 November 14, 2019
20191105 Application 1913609 Notice of Hearing - Regulatory Appeal AltaGas Ltd. 1913609 November 05, 2019
20191104 Application 1925359 Notice of Application - Eight Kilometres Southeast of Hardisty Gibson Energy ULC 1925359, and 001-00453881 November 04, 2019
20191028 Application OSE190031 Notice of Application - Northeast Region Harvest Operations Corp. OSE190031, 1924983, and 1924984 October 28, 2019
20191025 Application 104817 Notice of Hearing - Regulatory Appeal TAQA North Ltd 104817 October 25, 2019
20191010 Application 934887 Notice of Scheduling of Hearing - Hangingstone Field Pure Environmental Waste Management Ltd. 934887, etc. October 10, 2019
20191003 Application 1877294 Notice of Scheduling of Hearing - Common Carrier and Rateable Take Order Applications Bearspaw Petroleum Ltd. 1877294 and 1878333 October 03, 2019
20191001 Application 19M010 Notice of Application - Clearwater County Petrus Resources Corp. 19.M.010 October 01, 2019
20190926 Application 1911974 Notice of Cancellation of Hearing - 30 kilometres northwest of Grande Prairie Encana Corporation 1911974 September 26, 2019
20190923 Application 19M009 Notice of Application - Vulcan County Vanrena Resources Ltd. 19.M.009 September 23, 2019
20190917 Application 934887 Amended Notice of Hearing - Hangingstone Field Pure Environmental Waste Management Ltd. 934887, etc. September 17, 2019
20190912 Application 1923891 Notice of Application - Aurora North Oil Sands Mine Syncrude Canada Ltd. 1923891, 051-00000026, 013-00251073, etc. September 12, 2019
20190904 Application 1914582 Notice of Scheduling of Hearing - Alternative Water Hub Facility Trace Water Solutions Ltd. 1914582 September 04, 2019
20190828 Application 1918034 Notice of Cancellation of Hearing: Imperial Oil Resources Limited - Cold Lake Expansion Project Imperial Oil Resources Limited 1918034 August 28, 2019
20190826 Application 1918034 Notice of Scheduling of Hearing - Regulatory Appeal - Cold Lake Expansion Project Imperial Oil Resources Limited 1918034 August 26, 2019
20190826 Application 159466 Notice of Hearing - Regulatory Appeal - 20.7 Kilometres West of Pincher Creek Shell Canada Limited 159446 August 26, 2019
20190822 Application OSE190020 Notice of Application - Northeast Region Imperial Oil Resources Limited OSE190020, 1923510, and 1923511 August 22, 2019
20190815 Application 19M008 Notice of Application - Forty Mile County No. 8 Vanrena Resources Ltd. 19.M.008 August 15, 2019
20190812 Application 00246980-00-03 Notice of Cancellation of Hearing - EPEA Approval Amendments Gibson Energy Inc. 00246980-00-03 August 12, 2019
20190730 Application 19M006 Notice of Application - Red Deer Area Pine Cliff Energy Ltd. Amended to 19.M.006 July 30, 2019
20190730 Application 19M004 Notice of Application - Clearwater County Westbrick Energy Ltd. 19.M.004 July 30, 2019
20190730 Application 19M005 Notice of Application - Taber Area Sandpoint Resources Inc. 19.M.005 July 30, 2019
20190725 Application 00246980-00-03 Notice of Scheduling of Hearing - EPEA Approval Amendments Gibson Energy Inc. 00246980-00-03 July 25, 2019
20190725 Application 1922922 Notice of Application - Athabasca Oil Sands Area Suncor Energy Inc. 1922922 July 25, 2019
20190722 Application 1918034 Notice of Prehearing Meeting - Cold Lake Expansion Project Imperial Oil Resources Limited 1918034 July 22, 2019
20190719 Application OSE190003 Notice of Application - Northeast Region Cenovus Energy Inc. OSE190003 July 19, 2019
20190719 Application 1922239 Notice of Application - Twining Field Signalta Resources Limited 1922239 July 19, 2019
20190719 Application OSE190004 Notice of Application - Northeast Region Cenovus Energy Inc. OSE190004 July 19, 2019
20190719 Application OSE190005 Notice of Application - Northeast Region Cenovus Energy Inc. OSE190005 July 19, 2019
20190719 Application OSE190006 Notice of Application - Northeast Region Cenovus Energy Inc. OSE190006 July 19, 2019
20190710 Application 151150 Notice of Hearing - Regulatory Appeal of Reclamation Certificate Shell Canada Limited 151150 July 10, 2019
20190709 Application 402957 Notice of Cancellation of Hearing - 6 kilometres northwest of Rocky Mountain House Bonavista Energy Corporation 402957 July 09, 2019
20190708 Application 1877294 Notice of Hearing - Common Carrier and Rateable Take Order Applications Bearspaw Petroleum Ltd. 1877294 and 1878333 July 08, 2019
20190702 Application 1909839 Notice of Cancellation of Hearing - Regulatory Appeal of Reclamation Certificate Canadian Natural Resources Limited 1909839 July 02, 2019
20190702 Application 1914582 Notice of Hearing - Alternative Water Hub Facility Trace Water Solutions Ltd. 1914582 July 02, 2019
20190702 Application 934887 Notice of Hearing - Hangingstone Field Pure Environmental Waste Management Ltd. 934887, etc. July 02, 2019
20190627 Application 1922234 Notice of Application - Transfer of Ownership - Pike Project Devon Canada Corporation 1922234, and 005-00308463 June 27, 2019
20190627 Application 1922235 Notice of Application - Transfer of Ownership - Jackfish SAGD Project Devon Canada Corporation 1922235, 010-224816, 1220647, etc. June 27, 2019
20190627 Application 1922237 Notice of Application - Transfer of Ownership Devon Canada Corporation 1922237, 192233, 006-00010220, etc. June 27, 2019
20190619 Application 1909609 Notice of Cancellation of Hearing - 4.51 kilometres east of Brooks Canadian Natural Resources Limited 1909609, etc. June 19, 2019
20190613 Application 1211884 Notice of Application - North East Region Imperial Oil Resources Limited 1211884, 1921506, 1921507, etc. June 13, 2019
20190517 Application 1921176 Notice of application - Enhanced Bitumen Recovery Technology Pilot Project Imperial Oil Resources Limited 1921176 May 17, 2019
20190516 Application 1895930 Notice of Cancellation of Hearing - 38 kilometres south of Provost High Ground Energy Inc. 1895930, 1895932, 1895933, etc. May 16, 2019
20190516 Application 402957 Notice of Scheduling of Hearing- 6 kilometres northwest of Rocky Mountain House Bonavista Energy Corporation 402957 May 16, 2019
20190508 Application 1920699 Notice of Application - Paintearth Mine Prairie MInes & Royalty ULC 1920669, and 017-11364 May 08, 2019
20190429 Application 1890343 Notice of Cancellation of Hearing - Fishing Lake Métis Settlement Canadian Natural Resources Limited 1890343 April 29, 2019
20190425 Application 1920658 Notice of Application - Jackfish SAGD Project Devon Canada Corporation 1920658 April 25, 2019
20190424 Application 1912614 Amended Notice of Rescheduling of Hearing - Regulatory Appeal of Reclamation Certificate Canadian Natural Resources Limited 1912614 April 24, 2019
20190418 Application 158722 Notice of Scheduling of Hearing - 11 to 14 kilometres south of Fairview Canadian Natural Resources Limited 158722 and 158850 April 18, 2019
20190410 Application 1909839 Notice of Rescheduling of Hearing - Regulatory Appeal of Reclamation Certificate Canadian Natural Resources Limited 1909839 April 10, 2019
20190409 Application 1920247 Notice of Application - Tucker Thermal Project Husky Oil Operations Limited 1920247, and 010-00147753 April 09, 2019
20190401 Application 1918034 Notice of Hearing - Regulatory Appeal - Cold Lake Expansion Project Imperial Oil Resources Limited 1918034 and 1918035 April 01, 2019
20190325 Application 402957 Notice of Hearing - 6 kilometres northwest of Rocky Mountain House Bonavista Energy Corporation 402957 March 25, 2019
20190325 Application 00246980-00-03 Notice of Prehearing Meeting - Regulatory Appeal of EPEA Approval Amendments 00246980-00-03 and 00010801-02-02 Gibson Energy Inc. 00246980-00-03 and 00010801-02-02 March 25, 2019
20190313 Application 1909609 Notice of Hearing - 4.51 kilometres east of Brooks Canadian Natural Resources Limited 1909609, etc. March 13, 2019
20190305 Application 19M002 Notice of Application - Transfer of Ownership Canadian Natural Resources Limited 19.M.002 March 05, 2019
20190221 Application 1911974 Notice of Hearing - 30 kilometres northwest of Grande Prairie Encana Corporation 1911974 February 21, 2019
20190211 Application 158722 Notice of Hearing - 11 to 14 kilometres south of Fairview Canadian Natural Resources Limited 158722 and 158850 February 11, 2019
20190207 Application 1909839 Notice of Scheduling of Hearing - Regulatory Appeal of Reclamation Certificate Canadian Natural Resources Limited 1909839 February 07, 2019
20190125 Application 1895930 Notice of Hearing - 38 Kilometres south of Provost High Ground Energy Inc. 1895930, etc. January 25, 2019
20190125 Application 1890343 Revised Notice of Scheduling of Hearing - Fishing Lake Métis Settlement Canadian Natural Resources Limited 1890343 January 25, 2019
20190122 Application 1918225 Notice of Application - Tucker Thermal Project Husky Oil Operations Limited 1918225 January 22, 2019
20190115 Application 19M003 Notice of Application - Transfer of Ownership Husky Oil Operations Limited 19M003 January 15, 2019
20190111 Application 19M002 Notice of Application - Transfer of Ownership Westbrick Energy Ltd. 19M002 January 11, 2019
20190109 Application 19M001 Notice of Application - Transfer of Ownership Canadian Natural Resources Limited 19M001 January 09, 2019
20190109 Application 1820856 Revised Notice of Scheduling of Hearing - Mildred Lake Extension Syncrude Canada Ltd. 1820856 January 09, 2019
20181220 Application 1917507 Notice of Application - Pike 2 Project Devon Canada Corporation 1917507 December 20, 2018
20181219 Application 18M008 Notice of Application - Transfer of Ownership Summerland Energy Inc. 18M008 December 19, 2018
20181217 Application 1890343 Notice of Scheduling of Hearing - Fishing Lake Métis Settlement Canadian Natural Resources Limited 1890343 December 17, 2018
20181214 Application 18M007 Notice of Applicaiton - Transfer of Ownership Tamarack Acquisition Corp. 18M007 December 14, 2018
20181210 Application 18M006 Notice of Application - Transfer of Ownership Canadian Natural Resources Limited 18M006 December 10, 2018
20181204 Application 1916645 Notice of Application - Primrose North Pad Add Extension Project Canadian Natural Resources Limited 1916645 December 04, 2018
20181203 Application 18M005 Notice of Application - Transfer of Ownership KinMerc Oil & Gas Inc. 18M005 December 03, 2018
20181128 Application 1916572 Notice of Application - Canadian Natural Resources Limited Canadian Natural Resources Limited 1916572 November 28, 2018
20181120 Application 00246980-00-03 Notice of Hearing - Regulatory Appeal of EPEA Approval Amendments 00246980-00-03 and 00010801-02-02 Gibson Energy Inc. November 20, 2018
20181031 Application 1909281 Notice of Cancellation of Hearing - Regulatory Appeal of Reclamation Certificate Husky Oil Operations Limited 1909281 October 31, 2018
20181030 Application 1914617 Notice of Application - Two Lakes Sour Gas Processing Facility Pembina Gas Services Ltd. 1914617 October 30, 2018
20181029 Application 121666 Notice of Cancellation of Hearing - Reclamation Certificate for a Well Site Karve Energy Inc. 121666 October 29, 2018
20181016 Application 1914157 Notice of Application - Southeast Region Harvest Operations Corp. 1914157 October 16, 2018
20181015 Application 1893274 Notice of Hearing - 14 to 16 Kilometres Southwest of Warner Granite Oil Corp. 1893274, 1893275, and 1893277 October 15, 2018
20181012 Application 1913954 Notice of Application - Joslyn Creek Project Total E&P Canada Ltd. 1913954 October 12, 2018
20181009 Application 1913972 Notice of Application - Joslyn North Mine Total E&P Canada Ltd. 1913972 October 09, 2018
20181003 Application 1820856 Notice of Scheduling of Hearing - Mildred Lake Extension Syncrude Canada Ltd. 1820856 October 03, 2018
20180927 Application 1912614 Notice of Hearing - Regulatory Appeal of Reclamation Certificate Canadian Natural Resources Limited 1912614 September 27, 2018
20180921 Application 1877294 Notice of Adjournment of Hearing - Common Carrier and Rateable Take Order Applications Bearspaw Petroleum Ltd. 1877294 September 21, 2018
20180917 Application 1913374 Notice of Application - Coal Valley Mine Prairie Mines & Royalty ULC 1913374 September 17, 2018
20180914 Application 1909281 Notice of Scheduling of Hearing - Regulatory Appeal of Reclamation Certificate Husky Oil Operations Limited 1909281 September 14, 2018
20180911 Application 121666 Notice of Scheduling of Hearing - Reclamation Certificate for Well Site Karve Energy Inc. 121666 September 11, 2018
20180813 Application 1912209 Notice of Application - Southeast Region Devon Canada Corporation 1912209 and OSE180017 August 13, 2018
20180813 Application 1912210 Notice of Application - Southeast Region Devon Canada Corporation 1912210, 1912211, and OSE180016 August 13, 2018
20180803 Application 1912063 Notice of Application - Horizon Oil Sands Mine and Processing Plant Canadian Natural Resources Limited 1912063 August 03, 2018
20180731 Application 1903071 Notice of Hearing - 16.8 Kilometres North of Rocky Mountain House InPlay Oil Corp. 1903071 July 31, 2018
20180730 Application 1882385 Amended Notice of Hearing - Aspen Project Imperial Oil Resources Limited 1882385 July 30, 2018
20180727 Application 1882385 Notice of Hearing - Aspen Project Imperial Oil Resources Limited 1882385 July 27, 2018
20180725 Application OSE180008 Notice of Application - Oil Sands Exploration Program - Northeast Region Cenovus FCCL Ltd. OSE180008 and 1911401 July 25, 2018
20180725 Application OSE180009 Notice of Application - Oil Sand Exploration Program - Northeast Region Cenovus FCCL Ltd. OSE180009 and 1911392 July 25, 2018
20180725 Application OSE180010 Notice of Application - Oil Sands Exploration Program - Northeast Region Cenovus FCCL Ltd. OSE180010 and 1911394 July 25, 2018
20180725 Application OSE180007 Notice of Application - Oil Sands Exploration Program - Northeast Region Cenovus FCCL Ltd. OSE180007, etc. July 25, 2018
20180712 Application 1869537 Notice of Scheduling of Prehearing Meeting - Common Carrier and Common Processor Applications Tykewest Limited 1869537 and 1869547 July 12, 2018
20180704 Application 18.M.003 Notice of Application - Transfer of Ownership Birchcliff Energy Ltd. 18.M.003 July 04, 2018
20180628 Application 1909287 Notice of Application - Willesden Green Field Willesden Green Field 1909287 June 28, 2018
20180626 Application 1909281 Notice of Hearing - Regulatory Appeal of Reclamation Certificate Husky Oil Operations Limited June 26, 2018
20180621 Application 1890343 Notice of Hearing - Fishing Lake Métis Settlement Canadian Natural Resources Limited 1890343 June 21, 2018
20180614 Application 1908838 Notice of Application - Willesden Green Field Bellatrix Exploration Ltd. 1908838 June 14, 2018
20180613 Application 1905189 Amended Notice of Application - Aurora North Oil Sands Mine Site Syncrude Canada Ltd. 1905189 June 13, 2018
20180606 Application 1709793 Frontier Oil Sands Mine Project Teck Resources Limited 1709793 June 06, 2018
20180531 Application 121666 Notice of Hearing - Reclamation Certificate for Well Site Karve Energy Inc. 121666 May 31, 2018
20180530 Application 1820856 Amended Notice of Hearing - Mildred Lake Extension Syncrude Canada Ltd. 1820856 May 30, 2018
20180525 Application 1820856 Notice of Hearing - Mildred Lake Extension Syncrude Canada Ltd. 1820856 May 25, 2018
20180515 Application 1909318 Notice of Application - Cheviot Coal Mine Cardinal River Operations Ltd. 1909318, etc. May 15, 2018
20180514 Application 1909112 Notice of Application - Horizon North Pit Extension Canadian Natural Resources Limited 1909112, etc. May 14, 2018
20180510 Application 013-00149968 Notice of Application - Horizon Oil Sands Mine Canadian Natural Resources Limited 013-00149968 and 026-00201931 May 10, 2018
20180507 Application 1909172 Notice of Application - Vista Coal Mine Coalspur Mines (Operations) Ltd. 1909172, etc. May 07, 2018
20180503 Application 1909168 Notice of Application - Christina Lake Thermal Project Cenovus FCCL Ltd. 1909168 May 03, 2018
20180502 Application 1874178 Notice of Scheduling of Hearing - Six Kilometres North of Thorsby Blackspur Oil Corp. 1874178 and 146873 May 02, 2018
20180501 Application 1909050 Notice of Application - Grande Cache Coal Mine CST Canada Coal Limited 1909050, etc. May 01, 2018
20180426 Application 18M002 Notice of Application - Transfer of Ownership Whitecap Resources Inc. 18M002 April 26, 2018
20180419 Application 1877294 Notice of Prehearing Meeting - Common Carrier and Rateable Take Order Applications Bearspaw Petroleum Ltd. 1877294 and 1878333 April 19, 2018
20180316 Application 1877294 Notice of Hearing - Common Carrier and Rateable Take Order Applications Bearspaw Petroleum Ltd. 1877294 and 1878333 March 16, 2018
20180312 Application 1869537 Notice of Hearing - Common Carrier and Common Processor Applications Tykewest Limited 1869537 March 12, 2018
20180305 Application 1907525 Notice of Application - Primerose and Wolf Lake In Situ Oil Sands Project Canadian Natural Resources Limited 1907525 March 05, 2018
20180301 Application PLA5930 Notice of Application - Transfer of Ownership COR4 Oil Corp. PLA5930 March 01, 2018
20180301 Application PLA298 Notice of Application - Transfer of Ownership COR4 Oil Corp. PLA298 March 01, 2018
20180301 Application PLA810201 Notice of Application - Transfer of Ownership COR4 Oil Corp. PLA810201 March 01, 2018
20180228 Application LOC100497 Notice of Application - Transfer of Ownership Mount Bastion Oil & Gas Corp. LOC100497 February 28, 2018
20180227 Application 1907303 Notice of Application - Athabasca Oil Sands Area Suncor Energy Inc. 1907303 February 27, 2018
20180222 Application 1866028 Notice of Adjournment of Hearing - Environmental Protection Order of July 7, 2016 Husky Oil Operations Limited and Gibson Energy Inc. 1866028 February 22, 2018
20180220 Application 1874178 Notice fo Hearing - Six Kilometres North of Thorsby Blackspur Oil Corp. 1874178 February 20, 2018
20180206 Application LOC100016 Notice of Application - Transfer of ownership Mount Bastion Oil & Gas Corp. LOC100016 February 06, 2018
20180131 Application 1906604 Notice of Application - Tucker Thernmal Project Husky Oil Operations Limited 1906604 January 31, 2018
20180126 Application OSE180001 Notice of Application - Oil sands exploration program Imperial Oil Resources Limited OSE180001 January 26, 2018
20180126 Application 1905477 Notice of Application - Construct and operate a multiwell pad Imperial Oil Resources Limited 1905477 January 26, 2018
20180122 Application 1905189 Notice of Application - Aurora North Oil Sands Mine Site Syncrude Canada Ltd. 1905189, etc. January 22, 2018
20180109 Application 1880447 Notice of Scheduling of Hearing - Location: LSD 15-18-063-03W4M Canadian Natural Resources Limited 1880447 January 09, 2018
20180104 Application 1861615 Notice of Scheduling of Hearing - SE and SW10-56-21W4M Value Creation Inc. 1861615 January 04, 2018
20180104 Application 1904558 Notice of Application - Aurora North Oil Sands Mine Site Syncrude Canada Ltd. 1904558 January 04, 2018
Raw Date Number Name Date
20200807 Bulletin 2020-17 New Manual on Coal Development in Alberta August 07, 2020
20200716 Bulletin 2020-16 Invitation for Feedback on Draft Directive on Well Integrity Management July 16, 2020
20200707 Bulletin 2020-15 New Edition of Directive 060 July 07, 2020
20200623 Bulletin 2020-14 Temporary Suspensions of Monitoring and Reporting Requirements End July 15 June 23, 2020
20200623 Bulletin 2020-14 Temporary Suspensions of Monitoring and Reporting Requirements End July 15 June 23, 2020
20200619 Bulletin 2020-13 OneStop Enhancements and Fixes June 19, 2020
20200512 Bulletin 2020-12 Requirements Aimed at Reducing Methane Emissions Amended May 12, 2020
20200415 Bulletin 2020-11 Additional Information for Industry During COVID-19 Pandemic Response April 15, 2020
20200409 Bulletin 2020-10 Relief for Industry During COVID-19 Pandemic Response April 09, 2020
20200408 Bulletin 2020-09 Directive 023 (1991 edition) and Directive 078 Rescinded April 08, 2020
20200403 Bulletin 2020-08 Regulatory Documents Review April 03, 2020
20200402 Bulletin 2020-07 Regulatory Documents Review April 02, 2020
20200402 Bulletin 2020-06 Water Intake Fish Screen Requirements April 02, 2020
20200312 Bulletin 2020-05 Oil Sands Environmental Monitoring Program Regulation and Regional Monitoring Approval Conditions March 12, 2020
20200311 Bulletin 2020-03 Directive 065 and Manual 012 Updated to Align with Government Policy March 11, 2020
20200311 Bulletin 2020-04 Revisions to the Digital Data Submission System March 11, 2020
20200310 Bulletin 2020-02 Process Change When Resuming Drilling Operations after Setting Surface Casing March 10, 2020
20200116 Bulletin 2020-01 New Manual on the Decommissioning, Closure, and Abandonment of Dams at Energy Projects January 16, 2020
20191211 Bulletin 2019-35 Application for an Aboveground Reusable Bladder Within a Structural Frame December 11, 2019
20191209 Bulletin 2019-34 New Subsurface Order Institutes New Monitoring, Setback, and Response Requirements to Manage the Risk of Induced Seismicity in the Red Deer Region December 09, 2019
20191209 Bulletin 2019-33 Review of AER Industry Levy Methodology December 09, 2019
20191206 Bulletin 2019-32 IL 94-04 Rescinded December 06, 2019
20191129 Bulletin 2019-31 2019/20 AER Administration Fees (Industry Levy) November 29, 2019
20191120 Bulletin 2019-30 Change to Consent Requirements When Crown Mineral and Disposal Rights Overlap November 20, 2019
20191112 Bulletin 2019-29 Tracking and Manifesting Produced Water November 12, 2019
20191107 Bulletin 2019-28 Pipeline Integrity Management Programs Must Consider Slope Movement November 07, 2019
20191106 Bulletin 2019-27 Amendments to Manual 013: Compliance and Enforcement Program November 06, 2019
20191105 Bulletin 2019-26 New Edition of Directive 081 November 05, 2019
20191021 Bulletin 2019-25 IL 83-02 and ID 96-03 Rescinded October 21, 2019
20191018 Bulletin 2019-24 Revised Date for Move of New Well Applications to OneStop October 18, 2019
20191007 Bulletin 2019-23 New Edition of Manual 011 October 07, 2019
20191003 Bulletin 2019-22 Directive 056 Updated and New Well Applications Moved to OneStop October 03, 2019
20190808 Bulletin 2019-21 AER Approval Still Required for Disposal Schemes With a Crown Mineral Activity Authorization August 08, 2019
20190806 Bulletin 2019-20 Public Land Disposition Applications Moving to OneStop August 06, 2019
20190801 Bulletin 2019-19 Directive 050 Updated With New Soil Endpoint and Post-Disposal Sampling Values for Zinc August 01, 2019
20190715 Bulletin 2019-18 New Working Interest Cost Claim Form July 15, 2019
20190711 Bulletin 2019-17 2019/20 AER Administration Fees (Industry Levy) July 11, 2019
20190704 Bulletin 2019-16 National Energy Board Safety Advisory July 04, 2019
20190625 Bulletin 2019-15 Invitation for Feedback on Draft Requirements for Public Involvement June 25, 2019
20190620 Bulletin 2019-14 Invitation for Feedback on Revisions to Directive 081 June 20, 2019
20190530 Bulletin 2019-13 New Alberta Environment and Parks Surface Water Allocation Directive May 30, 2019
20190527 Bulletin 2019-12 New Subsurface Order Institutes New Monitoring, Setback, and Response Requirements to Manage the Risk of Induced Seismicity Near the Brazeau Reservoir May 27, 2019
20190516 Bulletin 2019-11 Public Land Disposition Applications Moving to OneStop May 16, 2019
20190508 Bulletin 2019-10 New Manual for Coal Mine Pit Wall Abandonment May 08, 2019
20190503 Bulletin 2019-09 2019/20 Orphan Fund Levy May 03, 2019
20190429 Bulletin 2019-08 Reminder of Increased Risk of Fire During Drier Months April 29, 2019
20190315 Bulletin 2019-07 Recommendations around Hydraulic Fracturing in the Red Deer Area March 15, 2019
20190225 Bulletin 2019-04 Update to Survey Plan Requirements When Applying for a Reclamation Certificate February 25, 2019
20190219 Bulletin 2019-03 Applications for Partial Upgraders February 19, 2019
20190214 Bulletin 2019-02 Update to Disposition Renewal Applications February 14, 2019
20190124 Bulletin 2019-01 Directive 060 Annual Methane Emissions Reporting in OneStop January 24, 2019
20181220 Bulletin 2018-41 The Approach to Administering the Remediation Regulation December 20, 2018
20181218 Bulletin 2018-39 Conservation and Reclamation Submissions for Mineable Oil Sand Sites December 18, 2018
20181217 Bulletin 2018-40 Production Curtailment Issues Panel Established December 17, 2018
20181214 Bulletin 2018-38 Change in Notification of Primary Recovery Scheme Applications for Well Spacing Within the Oil Sands Areas December 14, 2018
20181213 Bulletin 2018-37 Requirements Aimed at Reducing Methane Emissions Finalized December 13, 2018
20181210 Bulletin 2018-36 New Well Submissions Forms December 10, 2018
20181206 Bulletin 2018-35 Government of Alberta Curtails Production December 06, 2018
20181130 Bulletin 2018-34 Updated Alberta Environment and Parks Master Schedule of Standards and Conditions November 30, 2018
20181122 Bulletin 2018-33 Reporting Related to Closure Activities and Directive 039 Moving to OneStop November 22, 2018
20181121 Bulletin 2018-32 New Edition of Directive 017: Measurement Requirements for Oil and Gas Operations November 21, 2018
20181031 Bulletin 2018-31 Changes to the Public Lands Administration Regulation October 31, 2018
20181025 Bulletin 2018-30 New Edition of Directive 013: Suspension Requirements for Wells October 25, 2018
20181024 Bulletin 2018-29 New Edition of Directive 020: Well Abandonment October 24, 2018
20181018 Bulletin 2018-28 New Edition of Directive 056: Energy Development Applications and Schedules and New Manual October 18, 2018
20181011 Bulletin 2018-27 New Edition of Directive 054: Performance Presentations, Auditing, and Surveillance of In Situ Oil Sands Schemes October 11, 2018
20180924 Bulletin 2018-26 Reminder of Increased Risk During Migratory Bird Season September 24, 2018
20180911 Bulletin 2018-25 Directive 084 Reporting Moving to OneStop September 11, 2018
20180910 Bulletin 2018-24 Changes to Three Water Act Forms September 10, 2018
20180830 Bulletin 2018-23 Release of the Area-Based Closure Program Mapping Tool August 30, 2018
20180827 Bulletin 2018-22 Optional Process for Submitting Fluid Disposal Applications August 27, 2018
20180823 Bulletin 2018-21 Coordinated Submission of Related Applications for Oil Sands Exploration Activities August 23, 2018
20180821 Bulletin 2018-20 AER Application Systems Restored August 21, 2018
20180810 Bulletin 2018-19 Manual Process for Issuing Approvals for Temporary Field Authorizations, Seismic Exploration Permits, and Formal Land Dispositions August 10, 2018
20180726 Bulletin 2018-18 New Alberta Environment and Parks Directive About Scour Protection for Pipelines July 26, 2018
20180724 Bulletin 2018-17 Change to the Reclamation Application Presubmission Requirements July 24, 2018
20180719 Bulletin 2018-16 Clarifying the Difference between the Transfer of an AER Licence and the Sale or Transfer of the Contractual Right to Operate Wells and Facilities July 19, 2018
20180710 Bulletin 2018-15 Reclamation Certificate Application Tool Moving to OneStop July 10, 2018
20180619 Bulletin 2018-14 Directive 039: Revised Program to Reduce Benzene Emissions from Glycol Dehydrators – Updated June 19, 2018
20180604 Bulletin 2018-13 Changes to Geophysical Program Submission Forms June 04, 2018
20180530 Bulletin 2018-12 New Alberta Environment and Parks Groundwater Directive for Thermal In Situ Projects May 30, 2018
20180514 Bulletin 2018-11 2018/19 AER Administration Fees (Industry Levy) May 14, 2018
20180501 Bulletin 2018-10 Enhanced Monitoring During Spring Snow Melt May 01, 2018
20180424 Bulletin 2018-09 Invitation for Feedback on Draft Requirements for Reducing Methane Emissions April 24, 2018
20180423 Bulletin 2018-08 Announcing New AER Website April 23, 2018
20180409 Bulletin 2018-07 2018/19 Orphan Fund Levy April 09, 2018
20190314 Bulletin 2019-06 Amended Requirements in Directive 036 for the Certification and Storage of Blowout Preventers March 14, 2019
20180313 Bulletin 2018-06 Correction to Bulletin 2018-05 March 13, 2018
20180312 Bulletin 2018-05 Tour Reports and Some Notifications Moving to OneStop March 12, 2018
20190311 Bulletin 2019-05 AER Version of the Record of Site Condition Form March 11, 2019
20180222 Bulletin 2018-04 New Alberta Environment and Parks Water Directive February 22, 2018
20180216 Bulletin 2018-03 Issuance of Subsurface Orders 1B and 3A February 16, 2018
20180131 Bulletin 2018-02 Amendments to Well Blowout Prevention and Well Control Certification and Methods under Directives 008, 036, and 037 January 31, 2018
20180116 Bulletin 2018-01 OneStop – Water Act Approval Applications and Code of Practice Notifications January 16, 2018
DateRaw Number Application Number Company Name Description Date
20200729 2020 ABAER 009 1914551 Ovintiv Inc.

Hearing Cancellation Decision - Proceeding 394

July 29, 2020
20200707 2020 ABAER 008 104817 TAQA North Ltd.

Regulatory Appeal of Cancelled Reclamation Certificate

July 07, 2020
20200623 20200623A N/A Imperial Oil Resources Limited

Amendment to Decision 20200501A: Unilateral Amendment to Approval Conditions regarding Monitoring in relation to COVID-19

June 23, 2020
20200623 20200623B N/A Suncor Energy Inc. & Fort Hills Energy Corporation

Amendment to Decision 20200501B: Unilateral Amendment to Approval Conditions regarding Monitoring in relation to COVID-19

June 23, 2020
20200623 20200623C N/A Syncrude Canada Ltd.

Amendment to Decision 20200501C: Unilateral Amendment to Approval Conditions regarding Monitoring in relation to COVID-19

June 23, 2020
20200623 20200623D N/A Canadian Natural Resources Limited

Amendment to Decision 20200505A: Unilateral Amendment to Approval Conditions regarding Monitoring in relation to COVID-19

June 23, 2020
20200623 20200623E N/A In situ Project Operators

Amendment to Decision 20200520A: Unilateral Amendment to Approval Conditions for In Situ Project Operators regarding Monitoring in response to COVID-19

June 23, 2020
20200623 20200623F N/A Operators under the Oil and Gas Conservation Act

Amendment to Decision 20200520B: Unilateral Amendment to Approval Conditions for Operators under the Oil and Gas Conservation Act regarding Monitoring in response to COVID-19

June 23, 2020
20200602 2020 ABAER 007 1925863 Peyto Exploration & Development

Hearing Cancellation Decision - Proceeding 395

June 02, 2020
20200520 20200520A N/A In situ Project Operators

Unilateral Amendment to Approval Conditions regarding Monitoring in response to COVID-19

May 20, 2020
20200520 20200520B N/A Operators under the Oil and Gas Conservation Act

Unilateral Amendment to Approval Conditions regarding Monitoring in response to COVID-19

May 20, 2020
20200505 20200505A N/A Canadian Natural Resources Limited

Unilateral Amendment to Approval Conditions regarding Monitoring in response to COVID-19

May 5, 2020
20200501 20200501A N/A Imperial Oil Resources Limited

Unilateral Amendment to Approval Conditions regarding Monitoring in response to COVID-19

May 1, 2020
20200501 20200501B N/A Suncor Energy Inc. & Fort Hills Energy Corporation

Unilateral Amendment to Approval Conditions regarding Monitoring in response to COVID-19

May 1, 2020
20200501 20200501C N/A Syncrude Canada Ltd.

Unilateral Amendment to Approval Conditions regarding Monitoring in response to COVID-19

May 1, 2020
20200429 20200429A N/A Imperial Oil Resources Limited

Unilateral Amendment to Approval Conditions regarding Monitoring in response to COVID-19

April 29, 2020
20200429 20200429B N/A Suncor Energy Inc. & Fort Hills Energy Corporation

Unilateral Amendment to Approval Conditions regarding Monitoring in response to COVID-19

April 29, 2020
20200429 20200429C N/A Syncrude Canada Ltd.

Unilateral Amendment to Approval Conditions regarding Monitoring in response to COVID-19

April 29, 2020
20200429 20200429D N/A Canadian Natural Resources Limited

Unilateral Amendment to Approval Conditions regarding Monitoring in response to COVID-19

April 29, 2020
20200326 2020 ABAER 006 1923941 Canadian Coastal Resources Ltd.

Hearing Cancellation Decision - Proceeding 395

March 26, 2020
20200227 2020 ABAER 005 934887, etc. Pure Environmental Waste Management Ltd.

Applications for the Hangingstone Project

February 27, 2020
20200227 2020 ABAER 004 1910941 Pure Environmental Waste Management Ltd.

Regulatory Appeal of Approval WM 211 for Pure’s Hangingstone Facility

February 27, 2020
20200225 2020 ABAER 003 1913609 and Licence F51073 AltaGas Ltd.

Hearing Cancellation Decision - Proceeding 389

February 25, 2020
20200130 2020 ABAER 002 1877294 and 1878333 Bearspaw Petroleum Ltd.

Hearing Cancellation Decision - Proceeding 360

January 30, 2020
20200115 2020 ABAER 001 N/A Canadian Natural Resources Limited

Hearing Cancellation Decision - Proceeding 393

January 15, 2020
20191008 2019 ABAER 008 Errata 1709793, etc. Teck Resources Limited

Errata for Decision 2019 ABAER 008: Teck Resources Limited

October 08, 2019
20190926 2019 ABAER 012 1911974 Encana Corporation

Notice of Cancellation of Hearing - 30 kilometres northwest of Grande Prairie

September 26, 2019
20190913 2019 ABAER 011 1914582 Trace Water Solutions LTD.

Hearing Cancellation Decision - Proceeding 382

September 13, 2019
20190828 2019 ABAER 010 1918034 Imperial Oil Resources Limited

Regulatory Appeal of EPEA and OSCA Approval Amendments - 23 Kilometres Northwest of Cold Lake

August 28, 2019
20190812 2019 ABAER 009 00246980-00-03 and 00010801-02-02 Gibson Energy Inc.

Hearing Cancellation Decision - Proceeding 372

August 12, 2019
20190725 2019 ABAER 008 1709793, etc. Teck Resources Limited

Frontier Oil Sands Mine Project (Errata issued October 8, 2019)

July 25, 2019
20190722 2019 ABAER 007 158722 and 158850 Canadian Natural Resources Limited

Applications for Three Pipelines and a Free-Standing Liner (Action Plan: August 20, 2019)

July 22, 2019
20190716 2019 ABAER 006 1820856, etc. Syncrude Canada Ltd.

Mildred Lake Extension Project and Tailings Management Plan

July 16, 2019
20190710 2019 ABAER 005 1912614 Canadian Natural Resources Ltd.

Hearing Cancellation Decision - Proceeding 371

July 10, 2019
20190709 2019 ABAER 004 402957 Bonavista Energy Corporation

Hearing Cancellation Decision - Proceeding 380

July 09, 2019
20190619 2019 ABAER 003 1909609, etc. Canadian Natural Resources Limited

Hearing Cancellation Decision - Proceeding ID 378

June 19, 2019
20190516 2019 ABAER 002 1895930, etc. High Ground Energy Inc.

Hearing Cancellation Decision - Proceeding ID 374

May 16, 2019
20190429 2019 ABAER 001 1890343 Canadian Natural Resources Ltd.

Application for a Pipeline Licence

April 29, 2019
20190411 20190411A N/A Arrow Point Oil & Gas Ltd., Big Coulee Resources Ltd., and Drumlin Energy Corp.

Decision to Issue a Declaration Naming Christopher Hanne

April 11, 2019
20190311 20190311A N/A Arrow Point Oil & Gas Ltd., Big Coulee Resources Ltd., and Drumlin Energy Corp.

Decision to Issue a Declaration Naming Christopher Hanne

March 11, 2019
20190225 20190225A 1881219 Fort Hills Energy Corporation

Application for Fort Hills Tailings Management Plan

February 25, 2019
20190124 20190124A N/A Arrow Point Oil & Gas Ltd., Big Coulee Resources Ltd., and Drumlin Energy Corp.

Decision to Issue a Declaration Naming Alexander Juston Von Gramatzki (and/or Alexander Justin Hanne)

January 24, 2019
20181217 2018 ABAER 013 1869537 and 1869547 Tykewest Limited

Hearing Cancellation - Applications 1869537 and 1869547

December 17, 2018
20181217 2018 ABAER 014 1893274, 1893275, and 1893277 Granite Oil Corp.

Hearing Cancellation - Applications to Drill Four Horizontal Wells 14 to 16 Kilometres Southwest of Warner

December 17, 2018
20181031 2018 ABAER 012 1909281 Husky Oil Operations Limited

Regulatory Appeal of Reclamation Certificate 103730

October 31, 2018
20181029 2018 ABAER 011 121666 Karve Energy Inc.

Application for a Reclamation Certificate for a Well Site Ten Kilometres Northwest of Coronation

October 29, 2018
20181017 2018 ABAER 010 1903071, 1903493, 157592, and 157633 InPlay Oil Corp

Application for Licences for Two Wells, a Multiwell Oil Satellite, and Two Pipelines

October 17, 2018
20181001 2018 ABAER 009 1882385 Imperial Oil Resources Limited

Aspen Project  

October 01, 2018
20180716 2018 ABAER 008 1903103, 1903104, 1903105, 1903106, 1903107, 1903108, 1882170, 1882172, 1889616, and 1889618 Encana Corporation

Application for Eight Well Licences and Two Pipeline Licences

July 16, 2018
20180716 20180716A 1872083 Imperial Oil Resources Limited

Application for Kearl Mine’s Tailings Management Plan

July 16, 2018
20180704 2018 ABAER 007 1866028 and 1866029 Husky Oil Operations Limited and Gibson Energy Inc.

Regulatory Appeals of an Environmental Protection Order Issued July 7, 2016

July 04, 2018
20180621 2018 ABAER 006 146873 and 1874178 Blackspur Oil Corp.

Applications for a Well Licence and a Pipeline Licence

June 21, 2018
20180613 20180613A 1871794 Syncrude Canada Ltd.

Application for Aurora North Tailings Management Plan

June 13, 2018
20180612 2018 ABAER 005 1778538 Prosper Petroleum Ltd.

Rigel Project

June 12, 2018
20180604 2018 ABAER 004 1880447 Canadian Natural Resources Limited

Application for a Single-Well Bitumen Battery - Waseca Formation, Cold Lake Area (Action Plan: June 18, 2019)

June 04, 2018
20180523 20180523B 1870297 Canadian Natural Upgrading Limited Application for Jackpine Mine Tailings Management Plan May 23, 2018
20180523 20180523A 1870302 Canadian Natural Upgrading Limited Application for Muskeg River Mine Tailings Management Plan May 23, 2018
20180508 2018 ABAER 003 1861615 and 005-203303 Value Creation Inc.

Applications to Amend the Heartland Upgrader Project Approvals - Alberta’s Industrial Heartland Area (Action Plan: June 5, 2018)

May 08, 2018
20180328 2018 ABAER 002 1842705, 1851246, 1851250, and 001-00400207 Bashaw Oil Corporation

Applications for Proximity Critical Sour Wells - Nisku Formation, Drayton Valley Area

March 28, 2018
20180222 2018 ABAER 001 1866519 and 1866521 TransCanada Pipelines Limited

Decision for Applications for the White Spruce Pipeline Project Fort McKay Area (Action Plan: March 22, 2018)

February 22, 2018
20180208 20180208A N/A Sabanero Energy Corp.

Decision to Issue a Declaration Naming Donald Allen Currie

February 08, 2018
DateRaw Name Description Date
20200716 Draft Directive XXX Well Integrity Management July 16, 2020
20200714 Directive 040 Pressure and Deliverability Testing Oil and Gas Wells July 14, 2020
20200714 Directive 044 Requirements for Surveillance, Sampling, and Analysis of Water Production in Hydrocarbon Wells Completed Above the Base of Groundwater Protection July 14, 2020
20200707 Directive 008 Surface Casing Depth Requirements July 07, 2020
20200707 Directive 086 Reservoir Containment Application Requirements for Steam-Assisted Gravity Drainage Projects in the Shallow Athabasca Oil Sands Area July 07, 2020
20200408 Directive 009 Casing Cementing Minimum Requirements April 08, 2020
20200408 Directive 037 Service Rig Inspection Manual April 08, 2020
20200714 Directive 065 Resources Applications for Oil and Gas Reservoirs July 14, 2020
20191105 Directive 081 Water Disposal Limits and Reporting Requirements for Thermal In Situ Oil Sands Schemes November 05, 2019
20191003 Directive 056 Energy Development Applications and Schedules October 03, 2019
20190801 Directive 050 Drilling Waste Management August 01, 2019
20190314 Directive 036 Drilling Blowout Prevention Requirements and Procedures March 14, 2019
20200707 Directive 060 Upstream Petroleum Industry Flaring, Incinerating, and Venting July 07, 2020
20200512 Directive 017 Measurement Requirements for Oil and Gas Operations May 12, 2020
20200714 Directive 013 Suspension Requirements for Wells July 14, 2020
20181206 Directive 020 Well Abandonment December 06, 2018
20200403 Directive 054 Performance Presentations, Auditing, and Surveillance of In Situ Oil Sands Schemes April 3, 2020
20180911 Directive 084 Requirements for Hydrocarbon Emission Controls and Gas Conservation in the Peace River Area September 11, 2018
20180619 Directive 039 Revised Program to Reduce Benzene Emissions from Glycol Dehydrators June 19, 2018
20200408 Directive 059 Well Drilling and Completion Data Filing Requirements April 08, 2020
20171206 Directive 067 Eligibility Requirements for Acquiring and Holding Energy Licences and Approvals December 06, 2017
20171012 Directive 085 Fluid Tailings Management for Oil Sands Mining Projects October 12, 2017
20170202 Directive 071 Emergency Preparedness and Response Requirements for the Petroleum Industry February 02, 2017
Date Raw Name Description Date
20200623 News Release 2020-06-23 Temporary Suspensions of Monitoring and Reporting Requirements End July 15 June 23, 2020
20200609 Public Statement 2020-06-09 Temporary suspension of low risk monitoring and reporting June 09, 2020
20200330 News Release 2020-03-30 AER lays charges against Tamarack Valley Energy March 30, 2020
20200326 News Release 2020-03-26 AER announces appointment of new President and CEO March 26, 2020
20200312 News Release 2020-03-12 Journey Energy Inc. to pay $125 000 fine for June 2017 pipeline failure March 12, 2020
20200124 News Release 2020-01-24 Public safety around oil and gas infrastructure January 24, 2020
20200121 Public Statement 2020-01-21 A statement from the CEO: AER reorganization January 21, 2020
20200120 News Release 2020-01-20 Tourmaline, Topaz, and CWC Energy Services charged after H2S release January 20, 2020
20191028 Public Statement 2019-10-28 Interim appointments, budget, and restructuring update October 28, 2019
20191023 News Release 2019-10-23 AER Executives No Longer with the Organization October 23, 2019
20191004 Public Statement 2019-10-04 AER board responds to investigations into the International Centre of Regulatory Excellence October 04, 2019
20190620 News Release 2019-06-20 Journey Energy Inc. charged for June 2017 pipeline releases June 20, 2019
20190607 News Release 2019-06-07 AER releases annual reserves outlook June 07, 2019
20190501 News Release 2019-05-01 Alberta Energy Regulator responding to ceased operations at Trident Exploration May 01, 2019
20190305 Public Statement 2019-03-05 A statement from Sheila O’Brien, Chair, AER Board of Directors March 05, 2019
20190131 Public Statement 2019-01-31 Supreme Court of Canada issues Decision of Redwater January 31, 2019
20190102 News Release 2019-01-02 Syncrude pleads guilty to great blue heron deaths, ordered to pay $2.75 million January 02, 2019
20181210 News Release 2018-12-10 Panel to address issues from production curtailment December 10, 2018
20181130 News Release 2018-11-30 Gordon Lambert to serve as Interim CEO of the Alberta Energy Regulator November 30, 2018
20181102 News Release 2018-11-02 Jim Ellis resigns as AER president and Chief Executive Officer November 02, 2018
20181101 Public Statement 2018-11-01 Statement from the Alberta Energy Regulator November 01, 2018
20181009 Public Statement 2018-10-09 Building a Competitive Energy Industry in Alberta: AER President and CEO Jim Ellis October 09, 2018
20180808 Public Statement 2018-08-08 Facing the liability challenge in Alberta: AER president and CEO Jim Ellis August 08, 2018
20180713 News Release 2018-07-13 Guilty plea leads to $460 000 penalty for Nexen Long Lake pipeline spill July 13, 2018
20180510 News Release 2018-05-10 AER reports pipeline incidents are down due to improved performance May 10, 2018
20180510 Public Statement 2018-05-10 Shining a light on pipeline performance: AER president and CEO Jim Ellis May 10, 2018
20180215 Public Statement 2018-02-15 Why we are fighting: AER president and CEO Jim Ellis February 15, 2018
20171120 Media Advisory 2017-04 AER president and CEO speaking to international delegates November 20, 2017
20171109 News Release 2017-11-09 Supreme Court of Canada to hear AER appeal of the Redwater decision November 09, 2017
20170919 Media Advisory 2017-03 AER responding to bird fatalities in oil sands area September 19, 2017
20170901 News Release 2017-09-01 Prairie Mines & Royalty fined $95,000 September 01, 2017
20170803 News Release 2017-08-03 Syncrude charged with blue heron deaths August 03, 2017
20170706 News Release 2017-07-06 Nexen charged for July 2015 Long Lake pipeline spill July 06, 2017
20170630 News Release 2017-06-30 AER Issues Order to Journey Energy Inc. Following Two Crude Oil Emulsion Spills June 30, 2017
20170627 News Release 2017-06-27 The Year That Was: Five Things About the AER’s 2016/17 Annual Report June 27, 2017
20170613 News Release 2017-06-13 Lexin agrees to cooperate with receivership, director pays $175 000 June 13, 2017
20170609 News Release 2017-06-09 Guilty plea leads to $925,000 penalty for Obed Mountain Coal Mine spill June 09, 2017
20170531 News Release 2017-05-31 AER releases industry water use report to drive improved performance May 31, 2017
20170428 News Release 2017-04-28 AER to appeal Redwater decision to Supreme Court of Canada April 28, 2017
20170322 News Release 2017-03-22 Prairie Mines & Royalty ULC and Westmoreland Coal Company face charges March 22, 2017
20170228 News Release 2017-02-28 AER issues penalty to Murphy Oil Limited for 2015 spill February 28, 2017
20170228 News Release 2017-02-28_2 The AER releases Annual Reserves and Supply/Demand Outlook Report online February 28, 2017
20170223 News Release 2017-02-23 AER issues Peace River area directive February 23, 2017
20170221 News Release 2017-02-21 AER expands pipeline incident reporting to drive improved performance February 21, 2017
20170217 Media Advisory 2017-02 AER to hold technical briefing on pipeline performance February 17, 2017
20170215 News Release 2017-02-15 AER escalates enforcement action against Lexin Resources Ltd. February 15, 2017
20170214 Media Advisory 2017-01 AER briefing on corporate enforcement action February 14, 2017
20170113 Public Statement 2017-01-13 Supreme Court of Canada Ernst v. Alberta Energy Regulator decision January 13, 2017
Raw Data Number Name Date Availability
20200723 ST39 Alberta Mineable Oil Sands Plant Statistics Monthly Supplement July 23, 2020

Updated monthly
(3 months in arrears)

20200715 ST26 Alberta Coal Industry Monthly Statistics July 15, 2020

Updated monthly
(2 months in arrears)

20200806 ST53 Alberta In Situ Oil Sands Production Summary August 06, 2020

Updated monthly
(2 months in arrears)

20200805 ST103 Field and Pool Codes August 05, 2020

Updated monthly

20200805 ST102 Facility List August 05, 2020

Updated monthly

20200804 ST56 Gas Production Summary August 04, 2020

Updated monthly

20200727 ST59 Alberta Drilling Activity Monthly Statistics July 27, 2020

Updated monthly

20200524 ST60 Crude Oil and Crude Bitumen Batteries Monthly Flaring, Venting, and Production Data June 24, 2020

Updated monthly
(1 months in arrears) 

20200805 ST37 List of Wells in Alberta Monthly Updates August 05, 2020

Updated monthly

20200729 ST3 Alberta Energy Resource Industries Monthly Statistics July 29, 2020

Updated monthly
(1 months in arrears) 

20200630 ST50 Gas Processing Plants in Alberta June 30, 2020 Updated monthly
20200731 ST104 Business Associate (BA) codes for all registered licensees and agents July 31, 2020

Updated monthly

20200731 ST50 Gas Processing Plants in Alberta July 31, 2020

Updated monthly

20200727 ST60 Crude Oil and Crude Bitumen Batteries Monthly Flaring, Venting, and Production Data July 27, 2020

Updated monthly
(1 month in arrears)

20200727 ST13 Alberta Gas Plant/Gas Gathering System Statistics July 27, 2020

Updated monthly
(1 month in arrears)

20200605 ST44 Active Oil Sands Schemes Quarterly Edition June 05, 2020

Updated quarterly

20200108 ST103 Field and Pool Codes January 08, 2020

Updated monthly

20191004 ST60B Upstream Petroleum Industry Flaring and Venting Report October 04, 2019

Updated annually

20190823 ST107 AER Approved Oilfield Waste Management Facilities August 23, 2019

Updated as needed

20200608 ST98 Alberta Energy Outlook June 08, 2020