Skip to main content

Examiner Reports

Before the AER formed in 2013, our predecessor (the Energy Resources Conservation Board, or ERCB) would sometimes appoint examiners from its senior staff to conduct hearings.

Before the AER formed in 2013, our predecessor (the Energy Resources Conservation Board [ERCB]) would sometimes appoint examiners from its senior staff to conduct hearings. The examiners would submit a report to the ERCB, and it would make a decision.

Until 2001, these decisions were published separately from other decision reports. The ERCB called these publications examiner reports. After 2001, no distinction was made in the naming of decisions, and all reports were classified as decision reports.

The following reports are historical. Since the formation of the AER, examiners are no longer appointed to conduct hearings.

Report NumberCompany NameApplication NumberDescriptionDate
E98-10Magin Energy Inc.1012146Application for a Pipeline Permit
E98-11Olympia Energy Inc.980488Section 42 Review Well Licence No.0155130 OLYMPIA ET AL JUMP 8-17-26-5
E99-01Bonavista Petroleum Ltd.1020308, 1022809, 1022978, 1023336Compulsory Pooling and Pipelines, Blood and Magrath Areas
E99-02Talisman Energy Inc.1031007Application for a Gas Battery and Pipeline Permit Gordondale Field
E99-03Union Pacific Resources Inc.1026077, 1036629, 1038235, 1038236, 1038237, 1038810, 1038811, 1038820Applications for Well Licences and to Construct and Operate a Sour Gas Processing Facility and Associated Pipelines, Telfordville Field
E99-04Talisman Energy Inc.1041416, 1047693Application for a Pipeline Permit, Temporary Compressor and Permanent Booster Compressor, Medicine River Field, LSD 10-12-39-3 W5M