98-17Koch Oil Co. Ltd.

Application to Construct and Operate a Crude Oil Pipeline Terminal - Hardisty Area

98-16Shell Canada Limited

Application to Allow Lines 45 and 46 of the Carbondale Pipeline to Return to Service Pending Public Inquiry Section 43(5) Hearing

98-15Canadain 88 Energy Corp.

Application to vary or Rescind the Maximum Daily Allowable for a Horizontal Gas Well  - Crossfield East Field

98-13Canadian 88 Energy Corp.

Application to Expand a Sour Gas Processing Facility - Garrington Field

98-14Nova Gas Transmission Ltd.

Application to Construct a Sweet Natural Gas Transmission Pipeline Central Alberta System Main Pipeline Loop #2 Sundre to Carstairs Area (Harmattan Area)

98-11Caprice Holdings Inc.

Application to Construct and Operate an Oilfield Waste Management Facility - Brazeau/Elk River Area

98-12Federated Pipelines Ltd.

Application to Constuct and Operate a Crude Oil Pipeline from Valhalla to Doe Creek

98-10Smoky River Coal Limited

Application for Amendment of Permit C97-13 and Licences for Proposed No. 12 Mine South B2 Pit Development

98-09Shell Canada Limited

Application for a Well Licence - Quirk Creek Field

98-04 + AddendumWild Rose Pipeline Inc.

Application to Construct and Operate the Athabasca Pipeline Project from Fort McMurray to Hardisty