Skip to main content

Pilot Reporting

The following is a list of pilot requests received since 2024, which is updated monthly. We use pilot findings and learnings to continually evolve a modern and efficient regulatory system that keeps pace with innovation. For more information, see Pilots and Innovations.

If you have questions regarding the pilots listed in the table, contact inquiries@aer.ca.

Request Date Sort ascending Company nameSectorDecision DateDecision Status
Cenovus Energy Inc.Well Integrity Surface Casing Vent Flow / Gas Migration Repair PilotsApproved

Company requested to use a non-shrinking resin that creates an impermeable seal for gas micro-leaks around cement plugs and packers. It stops gas flow during abandonment and is mixed with cement to seal micro-annuli and repair surface casing vent flow or gas migration.


NA


6 - 12 months
Islander Oil & Gas Inc.In Situ Oil Sands Stand Alone PilotsApproved

Company requested to remove the Central Mound with the vertical/deviated wellbore and substituting with horizontal well. Company also requested for an extension to run the pilot for another year until the end of 2026.


Peace River


1 year
NuVista Energy Ltd.Well Integrity Surface Casing Vent Flow / Gas Migration Repair PilotsApproved

Company requested to use a product that uses natural soil microbes to produce limestone through a controlled metabolic process. When requested to well leakage pathways, it forms crystalline calcium carbonate, sealing and repairing surface casing vent flows and gas migration.


NA


6 - 12 months
Outlier Resources Ltd.Well Integrity Surface Casing Vent Flow / Gas Migration Repair PilotsApproved

Company requested to use a product that uses natural soil microbes to produce limestone through a controlled metabolic process. When requested to well leakage pathways, it forms crystalline calcium carbonate, sealing and repairing surface casing vent flows and gas migration.


NA


6 - 12 months
Canadian Natural Resources LimitedIn Situ Oil Sands Pilots Within Existing Commercial SchemesApproved

Company requested for the permission of a temporary injection test into the McMurray Formation.


Athabasca Oil Sands


0 - 6 months
Cenovus Energy Inc.In Situ Oil Sands Pilots Within Existing Commercial SchemesApproved

Company requested for Phase 2 of the E04 Pad permeability improvement trial.


Athabasca Oil Sands


1 - 2 years
Strathcona Resources Ltd.Well Integrity Surface Casing Vent Flow / Gas Migration Repair PilotsApproved

Company requested to use a product that uses natural soil microbes to produce limestone through a controlled metabolic process. When requested to well leakage pathways, it forms crystalline calcium carbonate, sealing and repairing surface casing vent flows and gas migration.


NA


6 - 12 months
Syncrude Canada Ltd.Oil Sands Mining PilotsApproved

Company requested to trial the following 6 different chemical aids to improve processing efficiency: CS22; CS23; Polyethylene glycol 8000 (PEG); Sodium Dodecyl Sulfate (Electrophoresis); Sodium hexametaphosphate; and Soluable Starch.


Syncrude Aurora North Plant


0 - 6 months
Suncor Energy Inc.Oil Sands Mining PilotsApproved

Company requested to field trial at oil sands mine site for the use of EnviroKleen as dust suppressant.


Fort Hills mine


0 - 6 months
Barnwell of Canada, LimitedWell Integrity Surface Casing Vent Flow / Gas Migration Repair PilotsApproved

Company requested to use a product that uses natural soil microbes to produce limestone through a controlled metabolic process. When requested to well leakage pathways, it forms crystalline calcium carbonate, sealing and repairing surface casing vent flows and gas migration.


NA


6 - 12 months