Skip to main content

Pilot Reporting

The following is a list of pilot requests received since 2024, which is updated monthly. We use pilot findings and learnings to continually evolve a modern and efficient regulatory system that keeps pace with innovation. For more information, see Pilots and Innovations.

If you have questions regarding the pilots listed in the table, contact inquiries@aer.ca.

Request Date Sort ascending Company nameSectorDecision DateDecision Status
Suncor Energy Inc.Oil Sands Mining PilotsApproved

Company requested to field trial at oil sands mine site for the use of EnviroKleen as dust suppressant.


Fort Hills mine


0 - 6 months

PR26-Suncor

Barnwell of Canada, LimitedWell Integrity Surface Casing Vent Flow / Gas Migration Repair PilotsApproved

Company requested to use a product that uses natural soil microbes to produce limestone through a controlled metabolic process. When applied to well leakage pathways, it forms crystalline calcium carbonate, sealing and repairing surface casing vent flows and gas migration.


Virgo


6 - 12 months

PR25-Barnwell

Enhance Energy Inc.Well Integrity Surface Casing Vent Flow / Gas Migration Repair PilotsApproved

Company requested to use a product that uses natural soil microbes to produce limestone through a controlled metabolic process. When applied to well leakage pathways, it forms crystalline calcium carbonate, sealing and repairing surface casing vent flows and gas migration.


Hercules


6 - 12 months

PR24-Ehance

Meg Energy Corp.Waste Management PilotsApproved

Company requested to use Pulsed-Power Plasma method (3P method) to physically separate bitumen-impacted horizontal drilling cuttings. This is an alternative management of drilling waste using a new technology not set out in Directive 050: Drilling Waste Management.


Christina Lake


0 - 6 months

PR23-Meg

TAQA North Ltd.Well Integrity Surface Casing Vent Flow / Gas Migration Repair PilotsApproved

Company requested to use a technology designed to melt casing, cement, and certain rock formations. After cooling, these materials solidify to create an impermeable, gas-tight, rock-to-rock barrier that extends across the well cross-section permanently. While forming a permanent zonal abandonment in wellbores, this technology also help with surface casing vent flow and gas migration issues.


Milo


6 - 12 months

PR22-TAQA

Canadian Natural Upgrading LimitedOil Sands Mining PilotsApproved

Company requested to temporarily use an alternative polymer as a component of the Centrifuged Fluid Fine Tailings/Coarse Sand Tailings (CFFT/CST) Mixed Deposit treatment process.


CNUL JPM Oil Sands Processing Plant


0 - 6 months

PR21-CNRL

Canadian Natural Resources LimitedOil Sands Mining PilotsApproved

Company requested to test the use of a dust suppressant along the coke haul road within a mine site. The objective is to determine the effectiveness of suppressants to bind dust particles to the surrounding aggregate forming a hard surface and consequently helping maintain the road surface condition.


CNRL Horizon


0 - 6 months

PR20-CNRL

Suncor Energy Inc.Oil Sands Mining PilotsApproved

Company requested to trial WaterPlus and DustBind for use as dust suppressants at Fort Hills mine.


Fort Hills mine


1 - 2 years

PR19-Suncor

Islander Oil & Gas Inc.In Situ Oil Sands Stand Alone PilotsApproved

Company requested to modify cyclic steam and flue gas injection experimental scheme to substitute the Direct Contact Steam Generator (DCSG), with a modular, mobile, Once Through Steam Generator (OTSG).


Peace River Oil Sands


1 - 2 years

PR17-Islander

Torxen Energy Ltd.Alternative Fugitive Emissions Alt-FEMP PilotsApproved

Company requested for a pilot that uses aerial methane detection combined with an alternative work practice that meets the same performance standards of Directive 060 to manage unintentional releases of hydrocarbons.


NA


2 years

PR18-Torxen